PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

4th floor interior metal framing Facing South-West.jpg Electrical split wire at for the 3rd floor motorized dampers Facing South.jpg Installed low roof curbs Facing East.jpg Installed roof curbs at the high roof Facing West.jpg Installing storm piping at the 3rd floor Facing North.jpg Storm piping at the 4th floor for the Low Roof Facing East.jpg Storm piping at the 4th floor for the Low Roof Facing West.jpg Welding metal clips at the 1st floor Facing East.jpg Erecting the stone panels at the East Elevation 4.jpg
Previous pageNext page Installing storm piping at the 3rd floor Facing North
Installing storm piping at the 3rd floor Facing North